Distributed Energy Resources
Many industrial, commercial, institutional, and agricultural operations have the right characteristics for CHP.
The key requirement for CHP is a constant heating or cooling load located near the site of the generating equipment.
The key requirement for Waste Heat to Power is a steady source of excess heat, typically from an exhaust stream, boiler, furnace, kiln, compressor station, or industrial process.